Schiphol – D-pier

Redevelopment of concourse D aprons at Schiphol Airport Apr 2015 – Dec 2017 Project description Six aprons with in total ten passenger boarding bridges and building connections To be able to handle the ‘Wide-body’ peak and ‘Narrow-body’ peak, the current and future flight planning of Schiphol demands more flexibility in Read more…

Schiphol – G-pier

Redevelopment of the G-pier aprons at Schiphol Airport Mar 2014 – Dec 2017 Project description Six aprons with each two passenger boarding bridges and one apron with one boarding bridge. In total 13 boarding bridges have been replaced. Schiphol Airport has build gatehouses on the aprons to separate the passenger Read more…

Schiphol – F-pier

Redevelopment of the F-pier aprons at Schiphol Airport Jun 2013 – Jun 2014 Project scope: 8 aprons with each two passenger boarding bridges and two fuel hydrants Schiphol Airport has build gatehouses on the aprons to separate the passenger flows to different floors of the pier. During the installation of Read more…